Photovoltaic Solar Park with Grid Connection of 10 MWp in Torregrossa

Installed capacity

10,089.83
kWp

Energy generated per year

17,650
MWh

CO₂ avoided

5,300
tons
image-soluxions-Torregrossa

Torregrossa (Lleida)

Related tags:
PHOTOVOLTAIC
image-soluxions-Torregrossa 1

In the municipality of Torregrossa (Lleida) we have developed a 10 MW grid-connected photovoltaic solar park on land, built with more than 16,188 state-of-the-art modules.

The project was executed on an area of 16.03 hectares and is directly connected to the electricity grid, providing renewable energy sufficient to cover the annual consumption of more than 5,000 homes.

The plant produces 17,650 MWh per year and prevents the emission of approximately 5,300 tons of CO₂ annually, equivalent to planting more than 250,000 trees.

image-soluxions-Torregrossa 2

The system features advanced monitoring technology that allows real-time tracking of production and ensures maximum performance at all times.

This photovoltaic park establishes Torregrossa as a reference point in Catalonia’s energy transition and reinforces our commitment to a greener, more sustainable future.

We love what we do, and it shows: we work with energy every day, know it from the inside, and know how to manage it wisely.