Photovoltaic Solar Park with Grid Connection of 2,595 kWp in Talarn

Installed capacity

2,595
kWp

Energy generated per year

4,289
MWh

CO2 avoided

1,280
tons
image-talarn

Talarn(Lleida)

Related tags:
PROCESSING AND LEGALIZATION
sa-lipmes-SOLUXIONS1

In Talarn, we have developed a ground-mounted photovoltaic solar park with an installed capacity of 2,595 kWp, aimed at generating 100% renewable energy, promoting the energy transition, and significantly reducing pollutant emissions.

The project was carried out under the 'turnkey' modality, which included all phases: from the initial technical design, permits and licenses management, administrative processing and legalization, to the construction and commissioning of the installation. Thanks to an integral and efficient management, the plant has been fully legalized within the established deadlines, ensuring compliance with all current regulations.

sa-lipmes-SOLUXIONS2

The installation consists of 6,864 photovoltaic modules, mounted on a ground structure that ensures optimal orientation and tilt to maximize energy production. With this configuration, the park generates 4,289 MWh of green energy annually, contributing to sustainable supply in the territory and reducing dependence on fossil fuels.

The environmental impact is notable: thanks to this plant, approximately 1,280 tons of CO₂ are avoided each year, a reduction equivalent to planting 60,750 trees.

This project is a clear example of how, with proper management of permitting and legalization, it is possible to promote large-scale installations that combine efficiency, sustainability, and regulatory compliance.

We love what we do, and it shows: we work with energy every day, know it from the inside, and know how to manage it wisely.

Shall we take the step together towards your energy transition?