Battery Hybridization Project in a Photovoltaic Installation in Cervera

Power

5.001,1
kWp

Capacity

8.944
kWh

Photovoltaic modules

7.694
units
image-cervera2

Cervera(Lleida)

Related tags:
HYBRIDIZATION
cervera2-SOLUXIONS1

The transformation of the energy model requires new proposals that optimize the use of renewable sources and improve their connection to the electrical grid. In this context, a battery hybridization project has been launched at an operational photovoltaic solar plant in the municipality of Cervera.

The initiative includes the installation of a storage system with a capacity of 8,944 kWh in an existing 5,001.1 kWp solar park, consisting of 7,694 photovoltaic panels and located on a 7.97-hectare site.

This action represents a step forward towards a more robust, flexible, and environmentally friendly energy model, supporting the energy transition and promoting full integration of renewable energies within the electrical system.

We love what we do, and it shows: we work with energy every day, know it from the inside, and know how to manage it wisely.

Shall we take the step together towards your energy transition?