Self-Consumption Photovoltaic Solar Installation in Miralcamp
Installed capacity
Energy generated per year
Monitoring

Miralcamp(Lleida)

In Miralcamp, a family-owned company with a long agricultural history trusts us to drive its energy transition with the installation of a 1,601.54 kWp self-consumption photovoltaic solar plant.
The installation was carried out in 4 successive phases, adapting to the company’s growth and always ensuring compliance with current regulations. It has a total of 4,696 photovoltaic modules, generating annually over 2,263 MWh of 100% renewable energy, significantly reducing the electricity bill and carbon footprint.

One of the highlights of this plant is the incorporation of an advanced monitoring system, which allows real-time control of production and surplus, detects potential issues for rapid action, obtains detailed production and consumption data, and generates daily reports.
In this way, the company can optimize the performance of the installation and make decisions based on real data.
With this project, the company consolidates its commitment to sustainability and energy efficiency, while strengthening its competitiveness within the agricultural sector.